The method of determining the size of the single-phase motor capacitor is detailed.


Release time:

10 Sep,2023

Electrical products sometimes inevitably encounter some leakage, with the point of the problem, explosion-proof motor will also present this situation, usually in the motor shell part, then what is the cause of these problems, and how to deal with and deal with it?

The method of determining the size of the single-phase motor capacitor is detailed.

Electrical products sometimes inevitably encounter some leakage, with the point of the problem, explosion-proof motor will also present this situation, usually in the motor shell part, then what is the cause of these problems, and how to deal with and deal with it?

1. Cause of the problem: The power cord and the grounding wire are connected incorrectly. This problem is generally due to the operation fault of the device and the explosion-proof motor. The treatment method is to connect it from the beginning.

2. The second reason for the problem is that the winding is damp and the insulation is aging. This kind of problem is mainly that the damp and aging parts of the explosion-proof motor are not replaced during production, operation and maintenance. Only the winding can be dried due to damp. If the insulation aging demand requires replacement of insulation.

3. Cause 3: Lead grounding. This kind of problem is generally caused by errors in production, operation and maintenance. When dealing with the problem, bandage or replace the lead to remove burrs and sharp corners around the lead. Lead jacket maintenance tube (such as glass fiber tube or rubber maintenance ring added at the presentation of the motor)

4. Cause 4: The coil end touches the end cover or the machine base. If it is such a problem, it may be a problem in planning or production. The corresponding treatment strategy is to wrap the winding and paint at the grounding place first, then pad the end cover or the machine base with insulation, coat the front and outside of the pad with dipping varnish, and then dry to integrate the insulation with the end cover or the machine base.

友情链接:上海悦丰仪器仪表 | 自动液氮泵 | 河南建筑材料研究设计院有限责任公司 | 辽宁宏昌重工股份有限公司 | 慈溪市精密铸造有限公司 | 铝合金门窗十大品牌★重庆鑫金川名门 | 湘潭市至诚机械制造有限公司 | 温州市华一机电有限公司 | 华西能源 | 苏州山林机械设备有限公司